Quantcast
Viewing all articles
Browse latest Browse all 8535

Forum Post: Difficulties with datums while importing Esri i3s into ArcGIS Earth

My processing workflow has taken data collected in projected coordinate systems with NAVD88, perform AT and reconstruction with the data still in its original coordinate system and vertical datum. I convert it to WGS84 in an i3s production. Upon bringing the .slpk files into ArcGIS Earth, it becomes evident that the data is floating 250-300m above the ground surface. I believe it is coming from a problem with Context capture's vertical datum shift capabilities, but I'm not sure. Has anyone found a way to fix this yet?

Viewing all articles
Browse latest Browse all 8535

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>