Thanks for answer! I've read both articles, and a couple of questions come up: Merging 3MX Files: I assume (?) that this method requires the two 3MX files to be geo-located? This is never the case in our scans. Does that mean that this method is not feasible to use for us? Merging Models: I realise that I need to study this a bit more, but one thing I cannot really figure out: Will this method lead to that the COMPLETE models is NOT needed to be re-produced after adding the detailed set? Bottom line: Will the production time of this method in practice differ from a complete new project/production?
↧