Hi all, I have processed 800 images to get the AT process done for the project A and similarly 800 images for project B. AT for each of the project(A,B) takes 140 minutes. When i merge the two project, it shows vertical elevation, therefore on the merge project i have to re run the AT process to get better results. But doing so, AT process starts from the initial taking 280 minutes(140+140) to complete. The AT process for collective 1600 images and merging of the individual projects " A and B " takes equal time. So here are my few queries for merging of the sub projects. 1. what would be the possible solution to get multiple subprojects AT done within minimum time period. 2. How to solve the merging of the subprojects without elevation: if rerunning the process of AT on merge projects is run, it is supposed to get the work done early compared to processing the all images of main projects at once Thanks
↧